Skip to main content
The Tylon trunk
The board says what is in flight. The trunk says what actually landed, on which day, and it reads a month at a time.

The line

HEAD → refs/heads/main at the top is what the line is: the branch this project promotes into, not an abstraction over it.
A card that reached the last stage of its flow, on the day it got there.
A card that is promised inside this window and has not gone out. One in the shot, still on the board in In development.
Solid where the work is done, dashed where the month has not happened yet. The dash is not a forecast; it is the part of August that is still in front of the team.
The filled square is a release that closed. Wallets, first half, with the cards it carried listed under On the trunk beneath it.

The five numbers

Each one is a sentence about the same window, and each says how it was counted — because a delivery metric nobody can reproduce is a delivery metric somebody will argue with. 28.6 days to land is the middle card, from the day it left Backlog to the day it landed. Read from 4 cards: the ones with no move out of the backlog have nothing to date them from, and are left out rather than counted as zero. 1 promotion refused is a move the provider would not take. 0 reverts opened is a revert pull request from a card that had already landed — the number that says whether what went out stayed out.
The arrows at the top right walk back through previous months, and the same window is available to a script at GET /v1/trunk.